|
City of Live Oak - Continuing Consultant |
|
|
|
|
Mr. Ronald P. Ferland, P.E. and Charles E.
Hortenstine, P.E. have both worked with the
City of Live Oak on various municipal projects
as the City’s continuing consultants. The
projects have varied greatly in scope ranging
from development review to a water treatment
plant renovation design. The construction cost
of the projects performed to date is
approximately $3 million. The various projects
include the following:
- Water Treatment and Supply Study
- Design and Construction Management of a
1.25 MGD Lime Softening Water Treatment
Plant.
- Design and Construction Management of
the Baker Subdivision Water and
Wastewater System and Road Paving Program
- Design and Construction Management of
the Phase I and II Wastewater System
Improvement Projects.
- Design and Construction Management of
the Pump Station No. 10 Renovation.
- Operating Permit Renewal for the 1.25
MGD Wastewater Treatment Plant. Tasks
included the development of an Operation
and Maintenance Performance Report and a
Capacity Analysis
Report.
- Negotiation assistance for the City’s Solid
Waste Agreement with Suwannee County.
- Development of the City’s Sampling and
Laboratory Quality Assurance Program
(QAP).
References:
Mr. Myron Holmes
City Administrator
(904) 362-2276
Mr. Willard Hewiett
Public Works Director
(904) 362-2276 |