City of Bushnell - Wastewater Feasibility Evaluation |
|
|
|
This project consisted of developing a
conceptual design of wastewater collection,
transmission,
treatment and effluent disposal
facilities to serve the City of Bushnell and Lake
Panasoffkee community. Several treatment
and effluent disposal siting and methodology
alternatives were evaluated.
Based on project
cost estimates derived from the recommended
alternatives, an evaluation of funding sources, including FmHA grant/loan, SRF loans and
conventional financing, was conducted and a utility rate structure determined for each
funding source. FmHA grant/loan preapplication
packages were prepared for the
City of Bushnell and Sumter County. This
project was funded through a cooperative
agreement between the WRWSA, SWFWMD,
Sumter County and the City of Bushnell.
References:
Mr. Jack Sullivan, Executive Director
Withlacoochee River Water Supply Authority
Post Office Drawer 190
Tallahassee, Florida 32302
(904) 224-5366
Mr Vince Ruano, City Manager
City of Bushnell
Post Office Box 115
Bushnell, Florida 33513
(904) 793-2591
|