| Orange County - Holden Heights Infrastructure Improvements |
|
|
|
|
The stormwater improvements include the conversion of open rural drainage facilities (swales and ditches) with closed urban drainage facilities (curb and gutter). Stormwater will be routed to new retention basin for treatment prior to discharge to Clear Lake or drainage wells. Roadway paving improvements will be accommodated as part of the sewer line construction restoration. Additionally, approximately 3 miles of currently unpaved roads will be paved. In addition to design, permitting and construction management, the BFA team is providing public information and funding assistance services. Public information activities include: public workshops, newsletters and an information repository located in the community. Funding assistance activities include development of a Municipal Services Taxing Unit (MSTU) and use of CDBG funds to assist residents in paying for sewer connection and septic tank abandonment costs. Construction Cost (Est.): $17,000,000Completion Date (Est.): 2004 Reference: Mr. Steve Rapp Project Manager Orange County Public Utilities 109 E. Church Street, Suite 300 Orlando, Florida 32801 Phone: (407) 836-7208 Fax: (407) 836-5379 |
| < Prev | Next > |
|---|
| Home |
| About Us |
| News & Events |
| Projects |
| Services |
| Clients |
| Careers |
| Contact Us |