City of Maitland - General Water Consultant

Barnes, Ferland and Associates, Inc. (BFA) provides the City of Maitland Water Department general water consultant services on an as-needed basis. Specific projects completed include:

  • Preparation of a cross-connection control program;
  • Preparation of a corrosion control evaluation report and FDEP general construction permit application;
  • Preparation of a confined space entry program/procedures;
  • Water distribution system hydraulic analysis and identification of improvements required to connect the existing private utility facilities to the City’s system. This assignment included participation at a public workshop for affected residents;
  • Design, permitting and construction management of 4500 gpm lower Floridan aquifer well;
  • Consumptive Use Permit application and response to Water Management District request for additional information (currently underway);
  • Design, permitting and construction management of approximately 5 miles of water mains throughout the City;
  • Miscellaneous “on-call” items as they arise, including water operation trouble-shooting.

Design Fees: $250,000
Construction: $1,200,000


Reference:
Ms. Cheryl Peters, Water/ WW Supt .
(407) 875-2115
Mr. Tony Leffin, Public Works Director
(407) 539-6252
City of Maitland
1776 Independence Lane
Maitland, Florida 32751